LEVEL APPLICATION DATA SHEET

Arjay Representative:

End Use: ___________________________________________________________________

System quoted to:_____________________________________________________________

Process Data

Material to be measured (Physical and Chemical). ______________________________________

____________________________________________________________________________

Does the Material composition change? Describe.

____________________________________________________________________________

____________________________________________________________________________

If bulk solids, does the moisture content vary?______________________________________

Is the dielectric known?

Does the dielectric change?

Tank construction material

Tank pressure minimum psi

maximum psi normal psi

Operating Temperature Min C.

Max C. Normal C.

Humidity Changes? Describe _____________________________________________________

______________________________________________________________________________

______________________________________________________________________________

Material Agitation? Describe _____________________________________________________

______________________________________________________________________________

______________________________________________________________________________

PROBE DATA

What length?

(If over 5', specify HEAVY DUTY requirement) _____________________________________

_____________________________________________________________________________

Probe coating is teflon. Is this acceptable?

If no, consult factory for alternates.

Process Fitting is 3/4" NPT SS for Standard Duty

1" NPT SS for Heavy Duty

Is this acceptable? If no, is one of the options acceptable?

Circle one. teflon kynar aluminum

If no, consult factory for alternatives.

Probe Data continued...

Is the process entrance flanged? What size?

What material? ___

Probe head is Standard Explosion Proof Cl 1, Gr. D,

Cl 2, Gr. E,F,G.

Does the probe have a linear ground reference? If not, is a 2" OD concentric shield welded on a 2" NPT bushing acceptable? Or, can the customer supply his own ground reference?

ELECTRONICS

Function required

on/off alarm contacts How many?

4-20mA output

indicating lights

time delay

differential

Power Input

12 vdc 24 vdc 120 vac 220 vac

INSTRUMENTATION ENCLOSURE

(instrumentation may be remote to one mile)

Nema 12 Nema 4 explosion proof

rack mount Nema 4X

(Standard)

PROCESS APPLICATION ANALYSIS

Provide a sketch showing pertinent dimensions, placement of probe entrance, process material entrance and exit, agitators, etc.

 

 

 

 

By: __________________________ Date: ___________________________

 

Arjay Engineering Approval By: ____________________________________

Date: ____________________________________


Download this form in Adobe PDF format for easy printing.